Please fill all required fields
      hirreslogo2.jpg                          
     
      DATE    
      NAME    
      ADDRESS    
      CITY    
      Hot Sun Industries Inc   STATE    
      13460 Cayuga Dr., Poway CA 92064   ZIP    
      858 683 0800     PHONE    
      www.h2otsun.com   EMAIL   required  
      h2otsun@gmail.com  
         
      POWERSTRIP SOLAR POOL HEATING QUOTATION  
        SIDEWAYS CONFIGURATION  
     
      Recommended sizing is at :    
         
      Count the number of rows of tiles and record the side to side measurements of the roof space.  
     
      Powerstrips will normally be assembled (headers attached to fin tubing) on the roof.  
     
      Below are the lengths that can be made up with our standard 88 foot rolls of fin tubing (4 inches wide)  
      For pricing choose the next larger length. You can treat the lengths as average lengths because you'll cut them from 88' long rolls
      Consult with Hot Sun by phone or e-mail with help figuring out how much fin tubing is required  
      If the lengths below result in excessive waste we'll precut custom lengths for you at a 10% surcharge  
     
      Qty   length   sq ft.   DSC01585a.jpg  
        1x 10      
        1x 12      
        1x 14      
        1x 16        
        1x 18        
        1x 22        
        1x 30        
        1x 44        
        1x 88     4 inch wide by 88 foot long roll Powerstrip is 29.33 sq ft  
                 
        Total sq. ft.      
               
        rolls fin tubing required   $176.00  
               
        header pipes required   $10.00  
               
                   
      ODDBALL LENGTHS at a 10% surcharge      
        FINTUBE  
      ENTER QTY   ENTER LENGTHS PRICE/SQ.FT.    
        1x   $6.60    
        1x   $6.60    
        1x   $6.60    
        1x   $6.60    
           
        more header pipes required   $10.00  
         
     
    IMG_1497a.jpg
     
         
      IMG_4519.JPG      
           
         
         
           
         
         
         
         
      headers   strap bracket riveted to a plate    
       
     
    removable couplings
    glue on couplings
      Choose removable or glue on couplings    
      Use glue on cplgs when the headers will be spaced. For example if    
      the roof edge is angled. One per header is calculated    
       
      Hardware:   quantities will be rounded up at no extra cost  
    IMG_1554a.jpg,IMG_1580a.jpg
     
     
             
         
        removable rubber couplings   5.50  
      with 2) all ss hose clamps      
        pvc couplings (glue on with pvc cement) 0.67  
        ss strap brackets riveted to plates 2.00  
      These glue between tiles      
        ss strap clamps   2.00  
        ss strap brackets   1.00  
        #32 all ss hose clamps        
        ppa coated ss strap (feet)   1.00  
           
           
           
           
      Hardware above is based on an assembly as shown below. Every second header has an assembly as shown on the left  
      with 18" of strap and every row of headers has an assembly as shown on the right with 2 feet of strap.  
         
     
    IMG_4543.JPG
    IMG_4530.JPG
     
         
         
         
         
         
         
         
         
         
             
         
         
         
     
    IMG01960.jpg
     
       
        hose clamp and strap bracket around white pipe provide a means
        to positively support weight with no risk of slippage  
         
        Two tube wide glue strip made of Powerstrip fin tubing can be used to
        secure the fin tubing before gluing to the roof  
        Video at  
         
        Will you use fin tube strapping?  
    Yes
    No
     
        You can just glue as you go if you're careful  
         
      price/ft  
      feet of 2 tube wide fin tube strap required $0.67  
      based on a hold down strap spaced every 2 feet  
     
     
    LoPressureside.jpg
     
     
       
      This quote is based on    
      this basic configuration    
       
      We still need to determine    
      there are no pressure issues    
      If there are, the parts list may change  
      but the price won't be affected very much  
       
       
       
       
       
     
     
    1.5
    2
      Choose 1.5" or 2" main pool plumbing. This is size of the pipe solar will tie into.  
      Solar ties in right after the filter usually.  
         
     
    2
    1.5
      Will you plumb solar with 2" or with 1.5"? The solar panels are 1.5" so  
      plumb to and from the collectors using 1.5" unless the run is really long  
      or the system is more than 800 sq ft. This calculator assumes that if you  
      plumb in 2" you'll split to 2 banks of 1.5" on the roof.  
         
         
      TOTAL Collector materials    
     
     
      Plumbing:      
          Some of the quantities below can't be changed because they are IMG_1982.JPG,IMG_1995.JPG clear check valve  
          calculated but we can adjust the order later.  
             
        2" swing check valve   $ 23.30  
          1.5" swing check valve   $15.00  
          2" clear swing check valve $25.00  
          1.5" clear swing check valve $20.00  
        (clear so you can see the return line flow)    
          2" tees     $2.00  
          1.5" tees     $1.32  
          2" ball valves     $16.59   ball valve  
          1.5" ball valves     $13.00  
          1.5" sp x 1/2"fipt bushings $1.38  
    IMG_2195.JPG
     
     
          1/2" pvc plugs (drain points) $0.80    
        (can be replaced with hose bibs)        
          teflon tape     $ 1.64    
          1/2" vacuum breaker   $ 20.00    
          2"x1.5" spxs bushings   $ 1.30   vacuum breaker  
          1 pt. 2717 pvc cement grey $12.00   IMG_2013.JPG  
          polyurethane roof and flashing seal $5.82  
          0-15psi pressure gage   $ 11.90  
          1/2" male x 1/4" fipt bushing $ 1.38  
        (for pressure gage)      
          1.5" end caps     $ 1.00  
          2" Compool 3 way valve   $ 36.00   pressure gage  
             
               
        CHOOSE AUTOMATIC OR MANUAL CONTROLS    
        INPUT 0's BELOW FOR MANUAL CONTROL, 1's for AUTOMATIC  
        IF THE POOL HAS AUTOMATION THEN ALL YOU NEED IS the actuator and roof sensor  
             
         
        solar controller   $256.00  
          Compool 24V actuator   $199.00  
        pool temp sensor   $22.00  
        air temp sensor   $22.00  
          Hot Sun roof sensor   $22.00  
         
         
      TOTAL Plumbing and auto controls    
     
     
      OTHER ITEMS OF POSSIBLE INTEREST:  
     
        4oz bottle CA adhesive   $45.00  
      (for joining fin tube to headers)      
      1 bottle does 60 headers      
     
    401-Multi-Cut-120x120.jpg
     
           
      IMG_1514a.jpg        
             
             
             
             
             
             
             
           
        Ronan anvil style cutter   $30.00  
      (for cutting fin tubing)      
     
    IMG_1558a.jpg,IMG_1554a.jpg
    IMG_44141.JPG
     
         
         
         
      For plumbing and misc securing:      
             
            strap bracket  
      slip collar made of pipe one size larger    
      #32 hose clamp will go up to 2" pipe sleeve    
           
             
             
        strap clamp  
        extra strap brackets   $1.00  
        extra strap bracket on plate $2.00  
        extra strap clamps   $2.00  
        feet of ppa coated ss strap $1.00  
        #32 all ss hose clamps   $1.00  
        extra 29.33 sq ft rolls fin tubing $175.98  
        extra headers   $10.00  
        extra removable couplings $5.50  
     
      TOTAL EXTRAS    
     
      TOTAL ALL ITEMS    
      Tax applies if you're in California or Canada  
      Free freight within continental USA and Canada  
     
      Notes: For sensor wire, 25 feet is included with the solar controller  
      use 18 GA security system wire outdoor rated or in conduit  
     
      Use pvc sch 40 pipe. Paint it with a small roller once the job is complete  
     
      Sizing your solar heater  
         
        Back to Tile Roof Web page  
         
        Back to Home Page  
       
    Powered By SpreadsheetConverter